Thursday, April 14, 2022

Solar job V

 

Eight 12 volt / 100 watt panels connected to the combiner box.  Four strings of 2 panels each - wired in series.  Each input string is fused for 12 amps.  Output goes through a 63 amp circuit breaker.  
Approximately 40 volts / 20 amps will go out to the MPPT charge controller.  80,87,57,0,B

2 comments:

Gary said...

How well does the wire insulation survive in the sunlight?

John Wells said...

It should be just fine. This solar wire has UV protection.