Set up blocks and rebar to firmly attach all four first flush downspouts off the greenhouse gutter system - to the ground. Porter Construction finished the spill way off the east side of the dam. Now I have to work out a deal on getting a big load of bentonite to line the water side of the reservoir. Did the Starlight tonight with JustMe (winner of the blog contest) and our friend Bob (who I have named a longhorn cow after - too complicated to explain.) Thought I would get a really good deal tonight because of the sign outside the restaurant. 87,100,61,0,B
Showing posts with label first flush. Show all posts
Showing posts with label first flush. Show all posts
Monday, May 23, 2011
Subscribe to:
Posts (Atom)


