Showing posts with label new solar job. Show all posts
Showing posts with label new solar job. Show all posts

Thursday, April 21, 2022

Solar job VII

 

another happy Starlink customer in the desert
92,97,62,0,B

Tuesday, April 19, 2022

Solar job VI

Power all hooked up and systems are nominal.  Scavanged junk yard parts for the client's Starlink dish coming by the end of the week.  88,93,61,0,B

Thursday, April 14, 2022

Solar job V

 

Eight 12 volt / 100 watt panels connected to the combiner box.  Four strings of 2 panels each - wired in series.  Each input string is fused for 12 amps.  Output goes through a 63 amp circuit breaker.  
Approximately 40 volts / 20 amps will go out to the MPPT charge controller.  80,87,57,0,B

Monday, April 11, 2022

Friday, April 8, 2022

Monday, April 4, 2022

Tuesday, March 29, 2022

Solar job ll

 

 
More parts arrived.  60 amp MPPT charge controller and a 200Ah lithium iron phosphate battery.  These batteries are much more efficient than agm or lead acid and have a long service life (10+ years)...and are incredibly lightweight.  The surplus agm batteries I am using in my systems (10 of them) are 135 Ah and weigh 100 lbs. each.  This 200 Ah battery weighs just 48 lbs.  Moley approves... 89,94,60,0,G

Monday, March 28, 2022

Solar job

 

Doing a little solar install for a part timer who has property near me.  At my suggestion, he ordered Starlink so he and his family (4 kids) will have internet when they come out to visit and so he can work remotely and spend a little more time out here.  Just got some of the panels today and Moley was on hand to check them out. 88,91,48,0,C